HomePage

Events & News :









In Progress
- Piran Hydro Power Plant has been inaugurated.
This HPP with 8.4 MW Power has been inaugurated on Thursday 24th Nov. with present of Kermanshah governor general, Sarpol, Ghasreshirin, Gilangharb's member of parliament, managing director of IWPC and a whole raft of authorities and involved personals.
Mr. Rezazade as managing director of IWPC in a speech at the place of power plant addressed that this power plant has 44 GWh annual energy productions which provides 30% peak and 70% off-peak electricity consumption of 175 Sarpole's villages.
It worth to mention that this executed power plant by Roshdsanat Co. is the first Pelton hydro power plant in Iran.







In Progress
- Tarik Hydropower plant project
Client : Iran Water and Power Resources Development Co.
Location : The TARIK Hydro-Power Project is located on the TARIK pregulating dam on the SEFIDROOD River in the Middle North part of the Islamic Republic of Iran, within a reach of 35 km from the RASHT city.
Scop of work :
Design, procurement, installation, commissioning and trial exploitation of power plant are the outline of this contract Scop of work. Except of turbine and generator all the other equipments are designing by Roshd Sanat and Iranian Experts and are will be supplied from the local manufacture in Iran.
The turbine and generator will be supplied from Austrian and reputable manufacturers.
The main activities of this project are as below:
- Mechanical equipment including 2x1500 KW Kaplan (Pit-type)- Horizontal Turbines
- Electrical and instrument equipment including 2*1800 KVA Vertical Generators
- Auxiliary equipments
- 20 KV transmission line
- Hydro mechanical equipment such as Trash racks(2sets), Power intake Stop log (1set), Emergency Tailrace Gates(2sets),…
- Gantry Crane(25 tons Capacity)
Design of main and some of auxiliary equipment manufacturing of equipment (main & auxiliary) is under construction .







In Progress
- EPC Project Shiraz Oil Storage
Client : Iran National Gas Company
Site : Quale Gig Gas Compressor Station
Duration of project : 9 months 2001-2002
Scope of work: Installation and commissioning and delivery of Mechanical and electrical equipment of gas compressor station in Turkmenistan pipe line with a capacity of 26 million cubic meter per day and 1080 pounds/cubic inch pressure including Turkmenistan – piping electrical and instrumentation – ignition alarm – Air filters and oil and others.







In Progress
- Ghale Nar Gas Compressor Station Project
Client : Manategh Naftkhize jonoob Co.
Location : Andimeshk – Poldokhtar Road
Duration of project : 30 months
Scope of work:
Fulfillment of detailed engineering consideration and procurement of collection & injection gas material of Ghale Nar Gas Station. Partnerships of Roshdsanat, Scetiran & Sanat Gostar Soheil Cos.are charged in this project.
The main activities of this project are as below:
• Design, procurement & installation of reciprocating compressors and its accessories with minor electrical, instrumental system and related piping.
• Side establishments of station which includes LV & HV torches, burn pit & puddle of separation water from hydro carburets liquids, and etc.
• Installation of vertical & horizontal electro pumps related to main process or related to minor systems, set of extinguishing fire system, water supply pumps, fuel system with side system includes electric, instrument & related piping.